Pre-excavation utility verification checklist

A one-page printable checklist for site leads, foremen, and ground-truth locators. Pull the 811 ticket, walk the marks, brief the crew, sign it off — the on-site checks to run before equipment enters the ground.

  • 811 ticket pulled at least 3 business days ahead of excavation
  • All member utilities acknowledged: water, gas, electric, sewer, telecom
  • Private-side utilities identified beyond the 811 footprint
  • Tolerance zone, hand-dig policy, and stop-work authority briefed at tailgate
Download the checklist
Enter your email and the PDF downloads immediately.

Field-relevant updates only — no newsletter churn, no card form, no phone field.

What you get

One sheet. Ten checks. A sign-off block.

The PDF is intentionally thin — designed to be walked, not read. Every entry throws the question a field lead should answer out loud before the bucket comes down.

A one-page printable PDF

Single sheet, landscape-friendly — drops into a clipboard and reads at arm’s length on the tailgate.

Field-ready shortlist

Ten on-site checks plus a sign-off block: crew lead, supervisor, ticket number, the date — the four things an investigator later wants to read first.

No signup wall beyond the email

One email field — that is it. No phone, no company size, no card. You get the PDF; we send field-relevant updates only when there is something genuinely worth sending.